Contact Us

Uganda Rubber Line New Material Water Treatment Project

Share this Case Study

Situation

The customer is building a new rubber new material factory in Uganda, Africa, and requires ultra pure water equipment during the production process. By sea or land transportation, the equipment was finally debugged and the effluent was qualified.

Solution

Chuanyi Company has conducted specialized design, considering the physical size requirements of equipment and containers, and manufactured products with qualified dimensions and quality according to customized design schemes, solving transportation and technical difficulties.

Outcome

Through meticulous attention to transportation and handling details, Chuanyi Company successfully provided customized solutions without any issues. Due to the successful installation of reverse osmosis equipment, the water plant project is running smoothly.

Client: Uganda Area Africa

Treatment Capacity: 30 m3/ Hour

Technologies Employed: Conventional filtration, primary reverse osmosis, secondary reverse osmosis, EDI electrodialysis ion exchange, etc.